Saturday, 26 September 2015

Thursday, 17 September 2015


The next evolution of Smart Bomb, able to access specific rooms through air conditioning ducts and the like.

Sunday, 13 September 2015

Greebling Practice - stage 5

First attempt at landing gear - simple telescopic design.  Unfortunately, it looked to flimsy for the size of the ship, so was ditched.

2nd try - a sturdier-looking double-folding design, with twin shock-absorbers.

Sunday, 6 September 2015

Greebling practice - stage 4

The upper surface is more-or-less fully panelled, so starting work on the underside.

Also, I've substituted an occlusion pass for the wireframe, as the wireframe was getting so dense it was hiding details

Saturday, 5 September 2015

Thursday, 3 September 2015

Greebing practice - stage 2

I've tweaked the turret design, and added all the greebles from the concept painting.  Next - the other side of the ship

Monday, 31 August 2015

Greeble Practice - Block out

Decided to turn the greeble-practice ship painting into a model
Currently I've finished the block out, with the major shapes.  I'm trying to treat it a bit like building a physical model, so bits like the ridged pipe are already done.